Subfield / Retained research
Design archive.
Original source studies stay available as the product evolves. The current direction is one retrofit system for qualified existing tanks; manufactured tanks are not offered, and earlier geometry is not automatically applicable to the retrofit.
Explore the current platform
Selected references
Understand the source.
Respect the revision.
Development boundaries
The controller baseline and connection studies retain their stated scope. Optional treatment studies remain separately gated. No source document establishes a released retrofit configuration.
Models, mechanisms and analysis
Find a research record.
104 of 104 studies
Historical names, geometry and calculations are preserved for context. They are not active tank offerings, field instructions or demonstrated treatment results.
Engineering record
Control platform

Link threaded stops

Current product family

Six-product CAD gallery
Engineering record
Design completion review

Standard tank partitions

Two-size tank family

Control fascia attachment

Link sleeve stops

Link integral receiver

Link gland margin

Link forward seal
Engineering record
Tank capacity study

Continuous tank casing

Protective tank geometry

Protective tank appearance

Subfield Link

Link collar retention

Link retaining-ring interface

Core enclosure mechanics

Recessed tank shell

Dual-opening roof analysis

Primary access

Body handling

Installation datums

Tank pipe mounts

Coarse screen

Screen grade controls

Screen transfer

Gravity receiver

Receiver isolation

Graphite product family

Original product family

Complete model library

Integrated design review

Appearance direction

Core

Tank Hub

Alarm

Field Node

Adapter

Field Filter

Screen

Treat

Access

Pump Dock

Connect

Sense Mount

Service Kit

Access Risers R1

Angular Seat Interface Study
Engineering record
Assembly Mass R1
Engineering record
Backbone Fabrication R1
Engineering record
Base Contact R1

Base Frame R1

Base Trays R1
Engineering record
Cable Ring Installation Audit
Engineering record
Cable Seal Audit

Core Barrier Study

Core Carrier Formed R9

Core Compartment Barrier R6

Core Divider Retention R5

Core Divider Retention Study

Core Faceplate Support Study

Core Faceplate Supports R4

Core Lock Clearance R10

Core R0
Engineering record
Core Rear Mount Fit R1

Core Rear Mount R7

Core Rear Mount R8

Core Rear Mount Study

Core Tray Mounts R3

Distributor Collection Fixture R1
Engineering record
Fitted Roof Analysis R1

Formed Vessel R1

Frame Joints R1
Engineering record
Laminate Roof R1
Engineering record
Manufacturing Coverage R3
Engineering record
Manufacturing Handoff

Media Hydraulics R1

Post Stability R1

Process Partitions R1
Engineering record
Pump Duty Basis R1

Roof Access Review R01

Roof Bearings R1

Roof Deck R1
Engineering record
Roof Grillage R1
Engineering record
Roof Grillage R2

Roof Joint Wraps R1
Engineering record
Roof Joints R1
Engineering record
Roof Mass Ledger R1

Roof Perimeter R1

Service Integration R1
Engineering record
Tank Bearing R31

Tank Family R01

Tank Groove R33
Engineering record
Tank Joint Review R30
Engineering record
Tank Roof Service R35
Engineering record
Tank Seal Basis R32
Engineering record
Tank Seal Profile R34

Vessel Shell R1

Wet Pilot R0

Subfield UV · Reactor R1
