Skip to content

The retrofit / Features

One platform.
Considered in every detail.

Treatment, mounting, connections and service designed around a suitable existing tank—not a new manufactured shell.

Development preview. Host-tank compatibility, treatment capacity, approvals and service intervals are not yet released. Development boundaries

Concept rendering, front cut away: a typical two-compartment concrete septic tank with two standard 24-inch access risers, the Subfield system inside both compartments, the outlet line to a drainfield trench, and the wall station on the house with one buried line to the compartment-2 riser.
Concept rendering · not a released design · untestedInstalled views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

01 / The receiving tank

A measured fit. Not a universal promise.

The receiving tank

Concrete, polyethylene and fiberglass tanks vary in geometry, condition and access. We are developing a finite range of adapters and qualified configurations, not a single insert assumed to fit every tank.

  • Survey the structure, usable volumes and pipe elevations.
  • Preserve settling, solids storage, freeboard and approved loading.
  • Check access, mounting, ventilation and the existing field.

Development boundaryNote 1

02 / Biological treatment

Each stage has a clear job.

Biological treatment

The development baseline combines preserved primary settling, an airlift-driven fixed-film rack and protected clarification. Our original media and airflow geometry must prove their value against conventional references.

  • Removable media sections with open, defined water passages.
  • Serviceable air-release components and a dedicated manifold.
  • Solids retention and accessible sampling before discharge.

Development boundaryNote 2

03 / Long-term access

Replace the part. Keep the system understandable.

Long-term access

Service is designed around retrieving the required module through a qualified access opening, without entering the tank or dismantling unrelated equipment.

  • Independent lifting points and controlled cable slack.
  • Accessible pump docks, seals and air components.
  • Human-readable part identities plus revision-matched digital records.

Development boundaryNote 3

Concept rendering: the compartment-2 lid set aside, the smart hub parked on the grass and one sectional media and aeration module lifted by its lift frame up out of the 24-inch riser.
Concept rendering · not a released design · untestedInstalled views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

04 / Installation detail

Fewer mysteries at every connection.

Installation detail

Factory-built harnesses, organized air lines and keyed interfaces are intended to reduce field terminations and connection mistakes. Visual consistency never makes incompatible functions interchangeable.

  • Distinct mechanical keying for power, data and hydraulic functions.
  • Qualified mains/Ethernet trunk and ordinary PoE sensor branches.
  • Configuration-specific diagrams and documented isolation procedures.

Development boundaryNote 4

05 / Local operation

Treatment is not a cloud feature.

Local operation

Bounded local controls and independent protective functions belong to the installation. The website and optional hosted services must not become prerequisites for essential operation.

  • Local operating profiles and deliberate recovery checks.
  • Visible power, communication and observation failures.
  • No subscription lockout of essential treatment or alarms.

Development boundaryNote 5

06 / Original assemblies

Designed together. Accounted for individually.

Original assemblies

Our plan is to manufacture Subfield’s treatment, mounting, control and connection assemblies, using qualified materials and electronic inputs. Pumps are purchased from qualified manufacturers rather than developed in-house. Production arrangements for the air pump or blower are still being evaluated.

  • Manufacturing drawings, materials and inspection criteria for every assembly.
  • Serialized hardware, component revisions and factory-test records.
  • Purchased pumps retain their manufacturer identity and approved operating limits.

Development boundaryNote 6

07 / Connected ownership

The right information for each responsibility.

Connected ownership

Homeowners, installers, maintainers and authorized officials need different tools. A shared installation record should make handoffs clearer without granting everyone control of the equipment.

  • Plain-language owner status and service history.
  • Offline commissioning, diagnostics and exact replacement-part context.
  • Permission-scoped reports and actual laboratory records for reviewers.

Development boundaryNote 7

08 / The downstream system

An upgrade that respects the whole site.

The downstream system

The receiving tank and downstream system must both fit the reviewed configuration.

  • Retain the existing approved disposal arrangement where suitable.
  • Select additional filtration or disinfection only for a defined requirement.
  • Document existing defects separately from the treatment retrofit.

Development boundaryNote 8

Development boundaries

Development boundaries

  1. The receiving tank. A damaged, undersized or inaccessible tank may not qualify. The tank, in-tank equipment and disposal arrangement require configuration-specific review. ↩︎
  2. Biological treatment. Capacity, energy use, cold-weather behavior and effluent results require complete-configuration testing. A 600-gallon/day development duty is not a rating. ↩︎
  3. Long-term access. Pumping, required inspections, normal wear and purchased-pump maintenance remain. Three-to-five-year treatment-hardware servicing is a research goal, not an approved schedule. ↩︎
  4. Installation detail. Electrical ratings, environmental qualification and independent protection remain release gates. No generic hot-plug or wet-mate claim is made. ↩︎
  5. Local operation. Loss of internet is not loss of power. A cut power/data trunk does not leave imaginary tank power or surviving measurements. ↩︎
  6. Original assemblies. This is a manufacturing-development plan, not a claim of current production, stocked parts or a released warranty. ↩︎
  7. Connected ownership. Role selection is not authentication. Hosted access requires real authorization; the available demonstration contains synthetic data only. ↩︎
  8. The downstream system. No guaranteed drainfield restoration, universal soil compatibility, potable-water output or unrestricted reuse is claimed. ↩︎

Before you begin

A clear starting point.

Understand the product direction, its limits and what must be proven before an installation.

Does it fit every septic tank?

No. The objective is broad coverage through a qualified range of host tanks and adapters. Condition, geometry, access, usable treatment and solids-storage volume, ventilation and the downstream field must all be reviewed.

Is this just a filter?

No. The proposed core is an aerobic biological process supported by fixed media, with controlled circulation and protected solids separation. Required coarse protection or field filtration performs a different job.

Is it rated for 600 gallons a day?

Not yet. Approximately 600 US gallons per day is an initial development duty. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.

Will it be maintenance-free?

No. The goal is maintenance without surprise, not maintenance-free: knowing how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits. These are design goals, not promises. Pumping, required inspections, wear components and purchased-pump care remain; a three-to-five-year interval is not established.

Do you manufacture the pumps?

No. Pumps are the explicit purchased exception to our original-assembly manufacturing plan. The air-pump or blower production arrangement remains under evaluation.

See all questions

Start with the installation you have

One system.
A clearer way forward.

Bring the records and questions you already have. A project brief starts the conversation; it does not approve a tank or reserve equipment.