The retrofit / Installation planning
The intended installation begins with eligibility and ends with an understandable, serviceable system.
No-entry access and clear connections are design requirements—not permission to skip site review.
Development preview. Host-tank compatibility, treatment capacity, approvals and service intervals are not yet released. Planning boundaries
Planning onlyNote 1

Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.
Who should install it
Anyone can buy the Subfield retrofit enhanced treatment system, but we strongly prefer that it be installed by a licensed septic or onsite wastewater professional. Local codes and permit requirements apply; check with your local health department or permitting authority before installing.
The system is being designed to be straightforward to install and service: the goal is that a qualified septic or onsite wastewater professional can work with it after a short product orientation, using concise instructions and clear, keyed connections. Local permit and qualification requirements still apply.
The Subfield retrofit enhanced treatment system is sold directly by Subfield. There is no online store or checkout yet: send an order request and the Subfield team handles the order from there, starting with whether your existing tank qualifies.
System price
$39,950
Typical installed total about $50,000. Installation is quoted by your installer and varies by site.
The receiving structure
The existing tank stays. Everything goes inside it, through its two standard 24-inch access ports.
The survey checks actual structure, watertightness, compartments, pipe elevations, usable treatment and solids-storage volume, access, mounting, ventilation and downstream disposal.
Host family under evaluation. Material alone does not establish eligibility.
Host family under evaluation. Material alone does not establish eligibility.
Host family under evaluation. Material alone does not establish eligibility.
Site-specific reviewNote 2
DisinfectionNote 3
From review to ownership
Gather the permit and system history, then have the receiving tank and field assessed by the appropriate professional.
Select only a released host-tank adapter and treatment arrangement that meets the application and jurisdiction requirements.
Arrange isolation, professional pump-out and inspection as required by the approved installation procedure.
The installation objective is independently handled modules through qualified riser openings, with the correct adapters and defined service clearances.
Document hydraulic, air, alarm and operating checks. Mechanical completion is separate from biological startup and any required performance sampling.
Provide the owner with clear status guidance, service contacts, required care and the installation record.
Prepare a useful brief
Do not open or enter a tank to complete this list. Bring available records and have measurements or inspections performed safely by the appropriate professional.
Prepare a retrofit briefThe years after installation
Subfield is not designing a maintenance-free system. The design goal is maintenance without surprise: you know how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits.
A service and ownership record that stays with the property when it changes hands: its configuration, service, repairs and component changes. This is a feature in development, not something available today.
Our goal is independently retrievable equipment, accessible wear interfaces and clear records. The eventual care plan must include normal pumping, required inspections, purchased-pump obligations and actual hardware service evidence.
Mechanical installation and biological readiness are separate milestones. A three-to-five-year hardware service goal is not an approved inspection interval or a promise of unattended treatment.

Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.
Before you begin
Understand the product direction, its limits and what must be proven before an installation.
No. The objective is broad coverage through a qualified range of host tanks and adapters. Condition, geometry, access, usable treatment and solids-storage volume, ventilation and the downstream field must all be reviewed.
No. The proposed core is an aerobic biological process supported by fixed media, with controlled circulation and protected solids separation. Required coarse protection or field filtration performs a different job.
Not yet. Approximately 600 US gallons per day is an initial development duty. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.
No. The goal is maintenance without surprise, not maintenance-free: knowing how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits. These are design goals, not promises. Pumping, required inspections, wear components and purchased-pump care remain; a three-to-five-year interval is not established.
No. Pumps are the explicit purchased exception to our original-assembly manufacturing plan. The air-pump or blower production arrangement remains under evaluation.
Start with the installation you have
Bring the records and questions you already have. A project brief starts the conversation; it does not approve a tank or reserve equipment.