Skip to content

The retrofit / Installation planning

Start with your tank.
Leave nothing to guesswork.

The intended installation begins with eligibility and ends with an understandable, serviceable system.

Installation planning

No-entry access and clear connections are design requirements—not permission to skip site review.

Development preview. Host-tank compatibility, treatment capacity, approvals and service intervals are not yet released. Planning boundaries

Planning onlyNote 1

Concept rendering, front cut away: a typical two-compartment concrete septic tank with two standard 24-inch access risers, the Subfield system inside both compartments, the outlet line to a drainfield trench, and the wall station on the house with one buried line to the compartment-2 riser.
Concept rendering · not a released design · untested
About this concept rendering

Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

Who should install it

A licensed professional,
strongly preferred.

Anyone can buy the Subfield retrofit enhanced treatment system, but we strongly prefer that it be installed by a licensed septic or onsite wastewater professional. Local codes and permit requirements apply; check with your local health department or permitting authority before installing.

Installation and ordering

The system is being designed to be straightforward to install and service: the goal is that a qualified septic or onsite wastewater professional can work with it after a short product orientation, using concise instructions and clear, keyed connections. Local permit and qualification requirements still apply.

The Subfield retrofit enhanced treatment system is sold directly by Subfield. There is no online store or checkout yet: send an order request and the Subfield team handles the order from there, starting with whether your existing tank qualifies.

System price

$39,950

Typical installed total about $50,000. Installation is quoted by your installer and varies by site.

  • Reserve with a $5,000 deposit, arranged with the Subfield team after your fit review.
  • Estimated delivery about 24 months from reservation. This is an estimate, not a firm date.
  • Financing options available. We'll walk you through them during your fit review.

The receiving structure

A good retrofit starts
with a suitable tank.

The existing tank stays. Everything goes inside it, through its two standard 24-inch access ports.

Tank eligibility

The survey checks actual structure, watertightness, compartments, pipe elevations, usable treatment and solids-storage volume, access, mounting, ventilation and downstream disposal.

Concrete

Host family under evaluation. Material alone does not establish eligibility.

Polyethylene

Host family under evaluation. Material alone does not establish eligibility.

Fiberglass / FRP

Host family under evaluation. Material alone does not establish eligibility.

Site-specific reviewNote 2

DisinfectionNote 3

From review to ownership

Six stages.
One clear handoff.

  1. 01Eligibility before equipmentSurvey the existing installation

    Gather the permit and system history, then have the receiving tank and field assessed by the appropriate professional.

    • Record actual condition, geometry, working volumes and access.
    • Identify structural, hydraulic and downstream limitations.
    • Missing critical information means further review—not assumed compatibility.
  2. 02One documented kitDefine the reviewed configuration

    Select only a released host-tank adapter and treatment arrangement that meets the application and jurisdiction requirements.

    • Document treatment and disposal objectives.
    • Include required utilities, field work and service obligations.
    • Obtain applicable design and permit approval before physical changes.
  3. 03A planned professional visitPrepare safe access

    Arrange isolation, professional pump-out and inspection as required by the approved installation procedure.

    • Preserve tank integrity and normal pump-out access.
    • Do not rely on personnel entry or unqualified lid-mounted loads.
    • No structural cuts or new penetrations are authorized by this planning guide.
  4. 04From above, by designFit the retrofit assemblies

    The installation objective is independently handled modules through qualified riser openings, with the correct adapters and defined service clearances.

    • Install the reviewed mounting, treatment and clarification arrangement.
    • Connect specified air, hydraulic and electrically keyed interfaces.
    • Use exact revision-matched instructions, not a universal field recipe.
  5. 05Measure, do not assumeCommission and establish treatment

    Document hydraulic, air, alarm and operating checks. Mechanical completion is separate from biological startup and any required performance sampling.

    • Verify installed equipment identities and approved settings.
    • Record actual tests, failures, corrections and sample obligations.
    • A completed checklist does not replace required inspection or laboratory results.
  6. 06Ownership starts informedHand over a serviceable system

    Provide the owner with clear status guidance, service contacts, required care and the installation record.

    • Assign the approved maintainer and inspection schedule.
    • Keep essential instructions and local operation available offline.
    • Preserve configuration and service history when ownership or components change.

Prepare a useful brief

Start with
what you know.

Do not open or enter a tank to complete this list. Bring available records and have measurements or inspections performed safely by the appropriate professional.

Prepare a retrofit brief
Planning checklist
  • Existing permit, as-built drawings and available tank manufacturer/model information.
  • Tank material, approximate age, service history and known structural or leakage concerns.
  • Available professional measurements of compartments, usable volume, risers and inlet/outlet elevations.
  • Household use, existing design flow and any unusual wastewater sources.
  • Current disposal arrangement: gravity, chambers, dosing, mound or drip, including known problems.
  • Safe access, existing utilities and the installation/service provider involved.
Download planning checklist

The years after installation

Service is part
of the product.

Ownership and service

Subfield is not designing a maintenance-free system. The design goal is maintenance without surprise: you know how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits.

A service and ownership record that stays with the property when it changes hands: its configuration, service, repairs and component changes. This is a feature in development, not something available today.

Our goal is independently retrievable equipment, accessible wear interfaces and clear records. The eventual care plan must include normal pumping, required inspections, purchased-pump obligations and actual hardware service evidence.

Mechanical installation and biological readiness are separate milestones. A three-to-five-year hardware service goal is not an approved inspection interval or a promise of unattended treatment.

Concept rendering: the compartment-2 lid set aside, the smart hub parked on the grass and one sectional media and aeration module lifted by its lift frame up out of the 24-inch riser.
Concept rendering · not a released design · untested
About this concept rendering

Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

Planning boundaries

Planning boundaries

  1. This is a planning guide, not field installation instructions. Qualified products, released procedures and applicable approvals are required before physical work. ↩︎
  2. The outcome is eligible as surveyed, eligible after specifically reviewed corrections, or not compatible. Unknown critical information stays unresolved; the tank, in-tank equipment and disposal arrangement require site-specific review. ↩︎
  3. Disinfection is a separate requirement. UV is a conditional research module, not an automatic feature of the base retrofit. The complete reactor, actual effluent quality, flow and service requirements need separate validation. Explore UV disinfection research; these source studies are not released installation instructions or evidence of safe reuse. ↩︎

Before you begin

A clear starting point.

Understand the product direction, its limits and what must be proven before an installation.

Does it fit every septic tank?

No. The objective is broad coverage through a qualified range of host tanks and adapters. Condition, geometry, access, usable treatment and solids-storage volume, ventilation and the downstream field must all be reviewed.

Is this just a filter?

No. The proposed core is an aerobic biological process supported by fixed media, with controlled circulation and protected solids separation. Required coarse protection or field filtration performs a different job.

Is it rated for 600 gallons a day?

Not yet. Approximately 600 US gallons per day is an initial development duty. A rating requires testing of the complete configuration at defined wastewater loads and operating conditions.

Will it be maintenance-free?

No. The goal is maintenance without surprise, not maintenance-free: knowing how the system is doing, what service is due and why, and what work will cost before it is done, with fewer surprise visits. These are design goals, not promises. Pumping, required inspections, wear components and purchased-pump care remain; a three-to-five-year interval is not established.

Do you manufacture the pumps?

No. Pumps are the explicit purchased exception to our original-assembly manufacturing plan. The air-pump or blower production arrangement remains under evaluation.

See all questions

Start with the installation you have

One system.
A clearer way forward.

Project brief

Bring the records and questions you already have. A project brief starts the conversation; it does not approve a tank or reserve equipment.