Who it’s for / Installers & maintainers

For installers and maintainers.

The intended installation begins with eligibility and ends with an understandable, serviceable system.

Installation planning

No-entry access and clear connections are design requirements—not permission to skip site review.

The system is being designed to be straightforward to install and service: the goal is that a qualified septic or onsite wastewater professional can work with it after a short product orientation, using concise instructions and clear, keyed connections. Local permit and qualification requirements still apply.

This is a planning guide, not field installation instructions. Qualified products, released procedures and applicable approvals are required before physical work.

Concept rendering: the compartment-2 lid set aside, the smart hub parked on the grass and one sectional media and aeration module lifted by its lift frame up out of the 24-inch riser.
Concept rendering · not a released design · untested
About this concept rendering

Installed views show an illustrative standard two-compartment concrete tank with two 24-inch access ports. Every in-tank part is shown going in and out through those ports; the combined media and aeration unit is shown as sectional modules, a design still in progress. They are not your tank and do not show that the system fits any particular tank.

Plan the installation.

Planning details: Plan the installation.
Tank eligibility
The outcome is eligible as surveyed, eligible after specifically reviewed corrections, or not compatible.
The six stages
Survey the existing installation · Define the reviewed configuration · Prepare safe access · Fit the retrofit assemblies · Commission and establish treatment · Hand over a serviceable system
The receiving tank
Concrete, polyethylene and fiberglass tanks vary in geometry, condition and access. We are developing a finite range of adapters and qualified configurations, not a single insert assumed to fit every tank.
The downstream system
Gravity, chamber, pressure-dosed, mound and drip arrangements have different requirements. The receiving tank and downstream system must both fit the reviewed configuration.

Connections, parts and service.

Planning details: Connections, parts and service.
Installation detail
Factory-built harnesses, organized air lines and keyed interfaces are intended to reduce field terminations and connection mistakes. Visual consistency never makes incompatible functions interchangeable.
Long-term access
Service is designed around retrieving the required module through a qualified access opening, without entering the tank or dismantling unrelated equipment.
Retrofit system compatibility
Review tank integrity, usable volumes, baffles, access, ventilation and the approved disposal system together. Nominal tank gallons do not establish treatment capacity.
Parts inside the system
Correct selection includes the surveyed host tank, installed role, hardware revision, electrical or hydraulic interface and required commissioning. Catalog entries are not a verified bundle.
Cables & connections
Subfield harnesses and keyed assemblies make identification easier while keeping incompatible electrical functions physically separate.
Tank & service
Host-specific mounts, access adapters, service carriers and retrieval interfaces—not a manufactured tank shell.

Register your interest.

Planning details: Register your interest.
Register interest as an installer or maintainer
Septic installers and maintainers can tell Subfield where they work and what they do.

Planned software.

Planning details: Planned software.
Installer and maintainer access
Survey the tank, identify the right configuration and work through clear, offline-capable commissioning records. Follow fault evidence, identify installed parts and record service and repair verification.

Common questions.

See all questions

Not published yet.

Installer program
Not published yet. Subfield strongly prefers installation by a licensed septic or onsite wastewater professional; no installer program or partner list is published. Installer and service partner listings
Installation instructions and manuals
Not published yet. Qualified procedures, exact ratings, required care and reviewed commercial terms follow product release. Document library

Talk to us about installation or service.

An inquiry is not an order, a reservation or an installation approval.