Why this detail was investigated.

At the current 6 mm reinforcement allowance, the nine frame members contribute 44.29 kg and the six wraps 14.35 kg, using the source study's assumed 1560 kg/m³ density. The modeled bondline adds 0.90 kg at a separately assumed 1200 kg/m³.

Read the research and limits

Research record

The detail behind
the study.

Source-linked work for this revision. Reported checks describe the stated model or test; physical qualification and applicability to the current retrofit remain separate.

Roof-frame mass and clearance ledger

At the current 6 mm reinforcement allowance, the nine frame members contribute 44.29 kg and the six wraps 14.35 kg, using the source study's assumed 1560 kg/m³ density. The modeled bondline adds 0.90 kg at a separately assumed 1200 kg/m³.

The frame-plus-wrap subtotal is 129.26 lb, leaving only 3.04 lb in the old 132.3 lb allocation for the complete structure. This is insufficient evidence that the center support, rim, wall/base frames, partitions and hardpoints can fit that allocation. The former 451.9 lb whole-tank planning total cannot be carried forward as the current design's weight.

The finished conservative opening remains 931 × 547 mm before a collar, seal or closure. The 3 and 4.5 mm cases show sensitivity only; neither is a selected or strength-verified alternative. No thickness may be reduced solely to recover weight.

The ledger measures CAD solid volumes, not manufacturing waste or weighed parts. Resin-rich zones, corner fillets, ply transitions, skin, seats, hardware and protective layers are not silently included. Adhesive mass uses an estimating assumption pending material selection. This is a partial estimate, not a BOM or a complete tank mass claim.

Source and revision record

Source: roof-mass-ledger-r1/READ-ME.md

Source SHA-256: 1145a225ab974bd6ac3cc956f72afefa38f237755b9fb9b9b8d0eda26f1c7a71

Geometry and images describe this development revision. Current product ratings and manufacturing release require separate qualification.

Return to the current product.

Explore the retrofit-only platform and its compatibility, installation and service objectives.

Explore the retrofit