Engineering records / Engineering record / CORE-DIVIDER-RETENTION-R5
Core Divider Retention R5.
Study overview
Geometry, analysis and remaining engineering work for Core Divider Retention R5.
Retained development study. Dimensions, names and checks belong to this revision—not automatically to the current retrofit system. Manufactured tanks are not offered. No installation instruction, certification or manufacturing release is represented.

View details
Source development view: core-divider-retention-r5/inspection.png. Engineering study; no product rating is implied.
The source reasoning
Why this detail was investigated.
The source reasoning
Controlled 64-part concept assembly, with two front-access divider screws and integral tray mounting lugs. Exterior geometry retains the current Subfield design.
Research record
The detail behind
the study.
Source-linked work for this revision. Reported checks describe the stated model or test; physical qualification and applicability to the current retrofit remain separate.
Read the research and limits
Subfield Core divider retention R5
Controlled 64-part concept assembly, with two front-access divider screws and integral tray mounting lugs. Exterior geometry retains the current Subfield design.
The divider is mechanically retained but does not form a complete power-compartment barrier. The geometry audit identifies open paths at both sides, behind the divider, before the faceplates, and between their front edges. These are CAD empty-volume observations, not electrical or standardized accessibility tests. Materials, production route, threads, fits, preload, loads, wiring, component selection and physical qualification remain unresolved. Rear-carrier attachment is also open. This package is not fabrication-ready.
Source and revision record
Source: core-divider-retention-r5/READ-ME.md
Source SHA-256: b887168ce36c639811a296434c94d6a6b45d56e1b1f4ec5694a1b7068f7a1f70
Geometry and images describe this development revision. Current product ratings and manufacturing release require separate qualification.
Return to the current product.
Explore the retrofit system and its compatibility, installation and service objectives.
Explore the retrofit

