Tank Joint Review R30.
Geometry, analysis and remaining engineering work for Tank Joint Review R30.
Retained development study. Dimensions, names and checks belong to this revision—not automatically to the retrofit-only product. Manufactured tank shells are deferred. No installation instruction, certification or manufacturing release is represented.
The source reasoning
Why this detail was investigated.
Both current tank sizes have a nominal 5 mm open roof-to-body gap. This geometry is shared by SUB1500 / SUBENG1500 and SUB2000 / SUBENG2000. A 3 mm-high cross-wall probe passes through the gap without touching either part. This establishes an open geometric path, not a measured leak rate.
Read the research and limitsResearch record
The detail behind
the study.
Source-linked work for this revision. Reported checks describe the stated model or test; physical qualification and applicability to the current retrofit remain separate.
Both current tank sizes have a nominal 5 mm open roof-to-body gap. This geometry is shared by SUB1500 / SUBENG1500 and SUB2000 / SUBENG2000. A 3 mm-high cross-wall probe passes through the gap without touching either part. This establishes an open geometric path, not a measured leak rate.
The sections below are cut from the actual R12 solids and reimported from STEP to verify their geometry. They expose the roof, end walls and base through a 30 mm-wide longitudinal slice.
- 1500-size roof/body section - 2000-size roof/body section - Measured joint evidence
The joint needs a defined structural bearing path, sealing land/groove, controlled compression, clamp/fastener layout and service procedure. Material/laminate properties, design loads, creep, tolerances and environmental exposure must determine those details. Filling the gap with an arbitrary solid would not establish a sealed or structurally qualified joint.
No tank is manufacturing released. These section exports are review evidence; they are not fabrication sections or validated laminate schedules.
Source and revision record
Source: tank-joint-review-r30/README.md
Source SHA-256: 927cd6d569ce6f8a7263a6d0a5f46dc4d250e4ba4323c276a224009a7631031a
Geometry and images describe this development revision. Current product ratings and manufacturing release require separate qualification.
Return to the current product.
Explore the retrofit-only platform and its compatibility, installation and service objectives.